Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0231 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $120 | Implemented |
KU0231 # 07 Y:1987 | 07 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $211 | $0 | Implemented |
KU0231 # 08 Y:1987 | 08 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $132 | $250 | Not Implemented |
KU0231 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $-79 | $0 | Implemented |
KU0228 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,815 | $14,465 | Implemented |
KU0228 # 01 Y:1987 | 01 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,760 | $0 | Not Implemented |
KU0227 # 08 Y:1987 | 08 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $152 | $290 | Implemented |
KU0227 # 07 Y:1987 | 07 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $125 | $0 | Implemented |
KU0227 # 06 Y:1987 | 06 | 1987 | COVER OPEN TANKS | $262 | $200 | Implemented |
KU0227 # 05 Y:1987 | 05 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $275 | Not Implemented |
KU0227 # 04 Y:1987 | 04 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $1,030 | $0 | Implemented |
KU0227 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $1,447 | $700 | Not Implemented |
KU0227 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,771 | $4,019 | Implemented |
KU0227 # 01 Y:1987 | 01 | 1987 | REDESIGN PROCESS | $8,861 | $5,000 | Not Implemented |
KU0228 # 03 Y:1987 | 03 | 1987 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,841 | $0 | Implemented |
KU0228 # 04 Y:1987 | 04 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,401 | $700 | Implemented |
KU0228 # 06 Y:1987 | 06 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,550 | $700 | Not Implemented |
KU0229 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $672 | $0 | Implemented |
KU0229 # 05 Y:1987 | 05 | 1987 | IMPROVE LUBRICATION PRACTICES | $2,689 | $0 | Not Implemented |
KU0229 # 04 Y:1987 | 04 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,157 | $1,260 | Not Implemented |
KU0229 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,410 | $2,100 | Not Implemented |
KU0229 # 02 Y:1987 | 02 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $1,678 | $8,000 | Implemented |
KU0228 # 09 Y:1987 | 09 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $153 | $0 | Implemented |
KU0228 # 05 Y:1987 | 05 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,064 | $0 | Implemented |
KU0228 # 07 Y:1987 | 07 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $919 | $1,700 | Implemented |