Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0212 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,707 | $330,000 | Not Implemented |
TT0212 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $283 | $250 | Implemented |
TT0212 # 10 Y:2018 | 10 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $2,270 | $1,720 | Not Implemented |
TT0212 # 09 Y:2018 | 09 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,775 | $5,000 | Implemented |
TT0212 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,795 | $16,665 | Not Implemented |
TT0212 # 07 Y:2018 | 07 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,248 | $34,845 | Not Implemented |
TT0212 # 06 Y:2018 | 06 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,427 | $79,168 | Not Implemented |
TT0212 # 05 Y:2018 | 05 | 2018 | METER WASTE WATER | $34,128 | $1,900 | Implemented |
TT0212 # 04 Y:2018 | 04 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $38,635 | $13,000 | Implemented |
TT0212 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,776 | $32,000 | Implemented |
TT0212 # 01 Y:2018 | 01 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $76,685 | $250,172 | Not Implemented |
TT0211 # 01 Y:2018 | 01 | 2018 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $115,103 | $150,000 | Implemented |
TT0211 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,109 | $3,750 | Implemented |
TT0211 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $25,620 | $100 | Not Implemented |
TT0211 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM TEMPERATURE | $67,812 | $300,000 | Not Implemented |
TT0211 # 04 Y:2018 | 04 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $73,737 | $75,000 | Not Implemented |
TT0211 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $89,245 | $600,000 | Not Implemented |
TT0211 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $96,921 | $15,000 | Not Implemented |