IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,761 $6,971 Implemented
MS0125 # 06 Y:1998 06 1998 $5,878 $14,990 Not Implemented
MS0125 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,888 $3,952 Not Implemented
MS0125 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $279 $10 Implemented
MS0125 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $125 $236 Implemented
MS0125 # 07 Y:1998 07 1998 $813 $324 Implemented
MS0125 # 04 Y:1998 04 1998 ELIMINATE/REDUCE AN OPERATION $3,255 $0 Implemented
MS0123 # 03 Y:1998 03 1998 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,682 $13,606 Not Implemented
MS0123 # 01 Y:1998 01 1998 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,920 $1,520 Implemented
MS0123 # 09 Y:1998 09 1998 $110 $25 Implemented
MS0123 # 04 Y:1998 04 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,528 $1,892 Not Implemented
MS0123 # 02 Y:1998 02 1998 USE RADIANT HEATER FOR SPOT HEATING $7,783 $9,763 Implemented
MS0123 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,576 $389 Implemented
MS0123 # 07 Y:1998 07 1998 INSTALL TIMERS AND/OR THERMOSTATS $4,448 $1,888 Implemented
MS0123 # 08 Y:1998 08 1998 BURN WOOD BY-PRODUCTS FOR HEAT $16,438 $80,000 Not Implemented
MS0123 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $11,310 $10,800 Implemented
MS0120 # 13 Y:1998 13 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,881 $17,414 Implemented
MS0120 # 12 Y:1998 12 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $-400 $0 Implemented
MS0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,885 $881 Implemented
MS0120 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $15,436 $142,800 Not Implemented
MS0120 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,664 $270 Implemented
MS0120 # 05 Y:1998 05 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,417 $1,000 Implemented
MS0120 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $5,805 Not Implemented
MS0120 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,888 $6,000 Not Implemented
MS0120 # 10 Y:1998 10 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $171 $82 Not Implemented