Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0060 # 08 Y:1995 | 08 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,418 | $1,500 | Implemented |
NC0060 # 07 Y:1995 | 07 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $1,556 | Implemented |
NC0060 # 06 Y:1995 | 06 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,634 | $4,545 | Implemented |
NC0060 # 05 Y:1995 | 05 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,838 | $15,000 | Not Implemented |
NC0060 # 04 Y:1995 | 04 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,567 | $15,000 | Not Implemented |
NC0060 # 03 Y:1995 | 03 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $354 | $2,430 | Not Implemented |
NC0060 # 01 Y:1995 | 01 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,626 | $0 | Implemented |
NC0060 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,215 | $19,196 | Not Implemented |
NC0059 # 06 Y:1995 | 06 | 1995 | RECOVER AND REUSE COOLING WATER | $27,000 | $6,000 | Not Implemented |
NC0059 # 05 Y:1995 | 05 | 1995 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,149 | $7,500 | Not Implemented |
NC0059 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,062 | $1,540 | Implemented |
NC0059 # 03 Y:1995 | 03 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $95,329 | $560,000 | Not Implemented |
NC0059 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $802 | $450 | Implemented |
NC0059 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,340 | $0 | Implemented |
NC0059 # 07 Y:1995 | 07 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $40,000 | $0 | Implemented |
NC0055 # 05 Y:1995 | 05 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,143 | $28,000 | Not Implemented |
NC0055 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $658 | $3,360 | Implemented |
NC0055 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,431 | $480 | Implemented |
NC0055 # 02 Y:1995 | 02 | 1995 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $144,508 | $638,000 | Not Implemented |
NC0055 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,521 | $1,200 | Implemented |
NC0055 # 06 Y:1995 | 06 | 1995 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $56,724 | $55,000 | Not Implemented |
NC0055 # 07 Y:1995 | 07 | 1995 | MINIMIZE WATER USAGE | $8,114 | $10,000 | Not Implemented |
NC0055 # 08 Y:1995 | 08 | 1995 | MINIMIZE WATER USAGE | $331,638 | $1,750,000 | Not Implemented |
NC0054 # 04 Y:1995 | 04 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,675 | $475 | Not Implemented |
NC0054 # 01 Y:1995 | 01 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,963 | $1,500 | Not Implemented |