IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0060 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $1,626 $0 Implemented
NC0060 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,634 $4,545 Implemented
NC0060 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $1,556 Implemented
NC0060 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,418 $1,500 Implemented
NC0059 # 07 Y:1995 07 1995 RECOVER AND REUSE WASTE MATERIAL $40,000 $0 Implemented
NC0059 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,062 $1,540 Implemented
NC0059 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $802 $450 Implemented
NC0059 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,340 $0 Implemented
NC0055 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $3,360 Implemented
NC0055 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,431 $480 Implemented
NC0055 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,521 $1,200 Implemented
NC0054 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,092 $360 Implemented
NC0054 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,438 $5,749 Implemented
NC0046 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $784 $600 Implemented
NC0046 # 05 Y:1995 05 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $605 $550 Implemented
NC0046 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,179 $6,550 Implemented
NC0046 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $251 $330 Implemented
TN0540 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,993 $2,290 Implemented
TN0540 # 01 Y:1995 01 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $5,373 $2,280 Implemented