IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0196 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,495 $100 Implemented
NC0196 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $8,142 $5,000 Not Implemented
NC0196 # 04 Y:2000 04 2000 OPERATE DISTILLATION COLUMNS EFFICIENTLY $292 $1,100 Not Implemented
NC0196 # 05 Y:2000 05 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,438 $10,000 Implemented
NC0196 # 06 Y:2000 06 2000 REVISE SMOKE CLEANUP FROM OPERATIONS $6,218 $8,400 Not Implemented
NC0196 # 07 Y:2000 07 2000 METER WASTE WATER $4,843 $15,000 Not Implemented
NC0196 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $1,080 Not Implemented
NC0198 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,448 $300 Implemented
NC0198 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,807 $18,000 Not Implemented
NC0198 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,264 $0 Implemented
NC0198 # 06 Y:2000 06 2000 USE SOLAR HEAT TO HEAT WATER $27,142 $97,350 Not Implemented
NC0198 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,845 $820 Implemented
NC0198 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $19,308 $41,718 Not Implemented
TN0692 # 07 Y:2000 07 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $900 Implemented
TN0692 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $1,300 Implemented
TN0692 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,336 $0 Implemented
TN0692 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
TN0692 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $4,210 $0 Implemented
TN0692 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,220 $11,900 Not Implemented
TN0692 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $700 Not Implemented
TN0692 # 02 Y:2000 02 2000 $899,000 $967,000 Implemented
TN0692 # 01 Y:2000 01 2000 $3,613,000 $645,000 Not Implemented
NC0184 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $120 Not Implemented
NC0184 # 02 Y:2000 02 2000 UPGRADE CONTROLS ON COMPRESSORS $685 $600 Implemented
NC0184 # 03 Y:2000 03 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $163 $240 Implemented