IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0104 # 07 Y:1996 07 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,733 $2,720 Implemented
NC0104 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,451 $25,000 Not Implemented
NC0104 # 02 Y:1996 02 1996 USE PHOTOCELL CONTROLS $1,117 $630 Implemented
NC0104 # 04 Y:1996 04 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,717 $2,017 Implemented
NC0104 # 05 Y:1996 05 1996 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $9,962 $30,000 Not Implemented
NC0104 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,017 $2,816 Implemented
NC0104 # 08 Y:1996 08 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,714 $54,000 Not Implemented
NC0104 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $840 Implemented
NC0087 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $862 $1,500 Implemented
NC0087 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $796 $1,839 Not Implemented
NC0087 # 01 Y:1996 01 1996 REDUCE VENTILATION AIR $1,513 $4,305 Not Implemented
NC0087 # 07 Y:1996 07 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,542 $1,800 Implemented
NC0087 # 04 Y:1996 04 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,789 $2,100 Implemented
NC0087 # 08 Y:1996 08 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $94 $750 Implemented
NC0087 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $965 $0 Not Implemented
NC0087 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $2,100 Not Implemented
NC0087 # 09 Y:1996 09 1996 SLOW INSERTION / WITHDRAWAL OF PARTS FROM DEGREASING TANK $3,360 $8,500 Implemented
NC0102 # 03 Y:1996 03 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,399 $2,500 Not Implemented
NC0102 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,100 $700 Implemented
NC0102 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,369 $30 Not Implemented
NC0102 # 07 Y:1996 07 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $36,217 $30,000 Not Implemented
NC0102 # 06 Y:1996 06 1996 USE OTHER WASTE CONCENTRATION METHODS $3,239 $5,000 Implemented
NC0102 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $2,500 Implemented
NC0102 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,712 $4,725 Not Implemented
NC0101 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $625 $100 Implemented