IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0613 # 01 Y:1997 01 1997 USE TEFLON LINED TANKS $525,690 $35,280 Not Implemented
TN0613 # 02 Y:1997 02 1997 $39,000 $17,200 Implemented
TN0613 # 03 Y:1997 03 1997 $35,000 $22,200 Not Implemented
TN0613 # 04 Y:1997 04 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,170 $1,040 Not Implemented
TN0613 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $3,470 $0 Not Implemented
TN0613 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $510 $0 Not Implemented
TN0613 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $280 Implemented
NC0112 # 01 Y:1997 01 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,780 $0 n/a
NC0112 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,183 $397 n/a
NC0112 # 03 Y:1997 03 1997 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,601 $20 n/a
NC0112 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,698 $300 n/a
NC0112 # 05 Y:1997 05 1997 RECOVER AND REUSE WASTE MATERIAL $16,220 $260 n/a
NC0112 # 06 Y:1997 06 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,750 $10,280 n/a
NC0112 # 07 Y:1997 07 1997 $60,000 $1,080 n/a
TN0607 # 01 Y:1997 01 1997 $27,000 $57,660 Implemented
TN0607 # 02 Y:1997 02 1997 RETURN SPENT SOLUTIONS TO THE MANUFACTURER $16,530 $0 Not Implemented
TN0607 # 03 Y:1997 03 1997 REDUCE SCRAP PRODUCTION $11,200 $23,800 Not Implemented
TN0607 # 04 Y:1997 04 1997 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,615 $2,400 Implemented
TN0607 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $7,500 $2,400 Not Implemented
TN0607 # 06 Y:1997 06 1997 DISCONNECT BALLASTS $1,100 $230 Not Implemented
NC0110 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,602 $200 Implemented
NC0110 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $240 Implemented
NC0110 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $363 $469 Implemented
NC0110 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,449 $1,160 Not Implemented
NC0110 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $101 $43 Not Implemented