IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0358 # 07 Y:2013 07 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $71,337 $190,000 Implemented
LE0358 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,919 $31,422 Implemented
DL0106 # 01 Y:2013 01 2013 REDUCE VENTILATION AIR $50,820 $2,200 Implemented
DL0106 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,083 $1,516 Implemented
DL0106 # 04 Y:2013 04 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $102,000 $2,375,000 Implemented
LE0360 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,342 $1,000 Implemented
LE0360 # 09 Y:2013 09 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $691 $700 Implemented
LE0360 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $366 $80 Implemented
LE0360 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,806 $3,200 Implemented
LE0360 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,056 $8,300 Implemented
LE0357 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $992 $225 Implemented
LE0357 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,839 $0 Implemented
LE0357 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $3,910 Implemented
LE0357 # 08 Y:2013 08 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,285 $4,500 Implemented
LE0357 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $41,310 $87,100 Implemented
LE0357 # 10 Y:2013 10 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $38 $110 Implemented
LE0357 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $20,522 $42,000 Implemented
LE0359 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,316 $2,704 Implemented
LE0359 # 07 Y:2013 07 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,600 $1,000 Implemented
LE0359 # 05 Y:2013 05 2013 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $2,575 $22 Implemented
LE0359 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,813 $1,554 Implemented
LE0362 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $12,000 Implemented
LE0362 # 07 Y:2013 07 2013 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $114,240 $200,000 Implemented
LE0362 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,545 $546 Implemented
LE0362 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162,427 $899,500 Implemented