IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0044 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $21,300 $575 Not Implemented
DL0044 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $31,002 $5,550 Not Implemented
DL0044 # 01 Y:2009 01 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $89,460 $41,150 Not Implemented
DL0044 # 06 Y:2009 06 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $37,189 $70,000 Not Implemented
DL0044 # 05 Y:2009 05 2009 MODERATE COOLING TOWER OUTLET TEMPERATURE $6,452 $0 Not Implemented
DL0044 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,400 $950 Not Implemented
DL0042 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,200 $1,760 Implemented
DL0042 # 09 Y:2009 09 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $469 $4,845 Not Implemented
DL0042 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,400 $41,000 Not Implemented
DL0042 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,600 $36,600 Not Implemented
DL0042 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $982 $500 Not Implemented
DL0042 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,332 $368 Not Implemented
DL0042 # 04 Y:2009 04 2009 ADD AREA LIGHTING SWITCHES $11,009 $1,325 Not Implemented
DL0042 # 02 Y:2009 02 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,180 $19,200 Not Implemented
DL0042 # 01 Y:2009 01 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,756 $0 Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,495 $11,500 Not Implemented
LE0289 # 02 Y:2009 02 2009 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,698 $2,600 Not Implemented
LE0289 # 05 Y:2009 05 2009 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,908 $12,000 Not Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented
LE0289 # 07 Y:2009 07 2009 USE SOLAR HEAT TO HEAT WATER $1,380 $3,640 Not Implemented
LE0289 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,474 $16,830 Not Implemented
LE0289 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,333 $6,137 Not Implemented
LE0289 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,734 $18,122 Not Implemented