IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0155 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $500 $0 Implemented
DL0155 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,960 $6,880 Not Implemented
DL0155 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,690 $0 Implemented
DL0155 # 04 Y:2015 04 2015 SHADE WINDOWS FROM SUMMER SUN $1,760 $6,840 Not Implemented
DL0155 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,405 $13,615 Not Implemented
DL0149 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,780 $0 Implemented
DL0149 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $29,215 Not Implemented
DL0149 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $1,200 Implemented
DL0149 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $3,200 Implemented
DL0149 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $1,430 Implemented
DL0149 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,930 $7,440 Implemented
DL0149 # 06 Y:2015 06 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $870 $50 Implemented
DL0149 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,060 $35 Implemented
DL0149 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $15,210 $630 Not Implemented
DL0149 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,900 $1,250 Not Implemented
DL0149 # 05 Y:2015 05 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,140 $40 Implemented
LE0400 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,673 $1,000 Implemented
LE0400 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,922 $10,500 Not Implemented
LE0400 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,723 $28 Implemented
LE0400 # 09 Y:2015 09 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,334 $16,500 Implemented
LE0400 # 05 Y:2015 05 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,027 $5,000 Not Implemented
LE0400 # 07 Y:2015 07 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,457 $3,025 Implemented
LE0400 # 04 Y:2015 04 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $8,953 $1,920 Not Implemented
LE0400 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,648 $512 Implemented
LE0400 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,074 $35,000 Not Implemented