Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0529 # 09 Y:2003 | 09 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $460 | $1,440 | Not Implemented |
CO0529 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $218 | $250 | Implemented |
CO0529 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $386 | $128 | Implemented |
CO0529 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,240 | $4,000 | Not Implemented |
CO0529 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,090 | $190 | Implemented |
CO0529 # 04 Y:2003 | 04 | 2003 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,810 | $3,920 | Implemented |
CO0529 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,790 | $16,530 | Not Implemented |
CO0529 # 02 Y:2003 | 02 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $5,520 | $5,060 | Not Implemented |
CO0529 # 01 Y:2003 | 01 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $41,400 | $7,000 | Implemented |
CO0528 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,940 | $10,310 | Not Implemented |
CO0528 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,720 | $13,150 | Not Implemented |
CO0528 # 04 Y:2003 | 04 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,000 | $3,000 | Not Implemented |
CO0528 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,850 | $16,010 | Not Implemented |
CO0528 # 02 Y:2003 | 02 | 2003 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $13,340 | $14,640 | Not Implemented |
CO0528 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,940 | $4,360 | Implemented |
CO0527 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,000 | $15,440 | Not Implemented |
CO0527 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $600 | $1,270 | Not Implemented |
CO0527 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $960 | $2,310 | Not Implemented |
CO0527 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $467 | $518 | Not Implemented |
CO0527 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,260 | $550 | Not Implemented |