IAC Assessment: CO0529
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0529
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Hard surfacing and brazing alloys
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 44
Plant Area (Sq.Ft.) 52,767
Annual Production 2,160,000 Pounds
Production Hrs. Annual 3,120
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,254 2,317,200 kWh $0.04
Electricity Demand $125,914 16,950 kW-months/year $7.43
Electricity Fees $68,988 - $ -
Natural Gas $25,839 4,430 MMBtu $5.83
TOTAL ENERGY COSTS $324,995
RECOMMENDED SAVINGS* $59,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,904
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$41,400
Cost:
$7,000
- - $41,400 3,600 - - -
-
kWh
$41,400
3,600
kW-months/year
-
-
$
02: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$5,520
Cost:
$5,060
$2,120 42,300 $3,400 296 - - $2,120
42,300
kWh
$3,400
296
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,790
Cost:
$16,530
$2,640 56,600 $2,690 234 $(-540) - $2,640
56,600
kWh
$2,690
234
kW-months/year
$(-540)
-
$
04: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$3,810
Cost:
$3,920
$1,880 40,100 $1,930 168 - - $1,880
40,100
kWh
$1,930
168
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,090
Cost:
$190
$780 16,200 $1,310 114 - - $780
16,200
kWh
$1,310
114
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,240
Cost:
$4,000
$1,240 24,800 - - - - $1,240
24,800
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$386
Cost:
$128
$206 4,448 $211 18 $(-31) - $206
4,448
kWh
$211
18
kW-months/year
$(-31)
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$218
Cost:
$250
$111 2,425 $107 9 - - $111
2,425
kWh
$107
9
kW-months/year
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$460
Cost:
$1,440
$230 5,100 $230 20 - - $230
5,100
kWh
$230
20
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$59,914
Cost:
$38,518
$9,207 191,973 $51,278 4,459 $(-571) - $9,207
191,973
kWh
$51,278
4,459
kW-months/year
$(-571)
-
$
TOTAL IMPLEMENTED Savings:
$47,904
Cost:
$11,488
$2,977 63,173 $44,958 3,909 $(-31) - $2,977
63,173
kWh
$44,958
3,909
kW-months/year
$(-31)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost