IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0584 # 04 Y:2024 04 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,396 $154 n/a
AS0584 # 05 Y:2024 05 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,118 $1,273 n/a
AS0584 # 06 Y:2024 06 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,113 $759 n/a
AS0584 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $1,782 $666 n/a
AS0584 # 01 Y:2024 01 2024 INCREASE USE OF AUTOMATION $73,061 $428,000 n/a
AS0584 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,817 $160,594 n/a
AS0584 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,657 $8,115 n/a
AS0583 # 02 Y:2024 02 2024 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $43,888 $15,124 n/a
AS0583 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $122 $476 n/a
AS0583 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $137 $172 n/a
AS0583 # 07 Y:2024 07 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $94 $52 n/a
AS0583 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,282 $4,696 n/a
AS0583 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $87,396 $642,159 n/a
AS0583 # 03 Y:2024 03 2024 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,022 $1,805 n/a
UU0193 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $946 $3,500 Not Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
SF0576 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,092 $14,612 Implemented
SF0576 # 01 Y:2021 01 2021 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,824 $0 Not Implemented
SF0576 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $41,072 $554,541 Implemented
SF0576 # 07 Y:2021 07 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $168,685 $1,228,444 Not Implemented
SF0576 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,261 $17,288 Implemented