IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0424 # 09 Y:2002 09 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $14,715 $45,000 Not Implemented
AS0340 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $5,518 Implemented
AS0340 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $340 $600 Not Implemented
AS0340 # 03 Y:2002 03 2002 INSTALL SKYLIGHTS $36,748 $54,898 Not Implemented
AS0340 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,190 $0 Not Implemented
AS0340 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $155 $20 Implemented
AS0340 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,051 $30 Not Implemented
AS0340 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $13,263 $6,971 Not Implemented
AS0340 # 08 Y:2002 08 2002 OPTIMIZE PLANT POWER FACTOR $6,618 $1,590 Not Implemented
AS0340 # 09 Y:2002 09 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,135 $13,732 Not Implemented
AS0340 # 10 Y:2002 10 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,400 $8,554 Not Implemented
AS0340 # 11 Y:2002 11 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,624 $4,800 Implemented
OR0424 # 07 Y:2002 07 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $20,311 $1,000 Implemented
AS0340 # 12 Y:2002 12 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,500 $6,000 Not Implemented
OR0424 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,470 $12,200 Implemented
OR0424 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,349 $0 Not Implemented
OR0424 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $69,350 $46,000 Implemented
OR0424 # 03 Y:2002 03 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $158,150 $118,500 n/a
AS0340 # 13 Y:2002 13 2002 CLEAR AND RENT EXISTING SPACE $60,660 $8,804 Implemented
OR0424 # 01 Y:2002 01 2002 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $577,590 $207,147 n/a
OR0424 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $958,574 $1,727,000 Not Implemented
OR0424 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $119,700 $241,870 Not Implemented
AS0338 # 04 Y:2002 04 2002 REPLACE BOILER $1,014 $2,300 Not Implemented
AS0339 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $393 $1,000 Not Implemented
AS0338 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $875 $2,400 Implemented