IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0226 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,304 $0 n/a
SU0226 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,426 $0 n/a
SU0226 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $5,978 $0 n/a
SU0226 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,658 $0 n/a
SU0226 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $770 n/a
SU0226 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,961 $20,200 n/a
SU0226 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $1,422 n/a
SU0226 # 08 Y:2006 08 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $53,622 $114,259 n/a
SU0226 # 09 Y:2006 09 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $321 $684 n/a
SU0226 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $5,381 $33,320 n/a
SU0183 # 01 Y:2004 01 2004 $83,900 $0 Implemented
SU0183 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,014 $0 Not Implemented
SU0183 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $331 $0 Implemented
SU0183 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,663 $502 Not Implemented
SU0183 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $680 Implemented
SU0183 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $18,502 $12,517 Not Implemented
SU0183 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $483 $523 Implemented
SU0183 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,288 $16,817 Implemented
SU0183 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,121 $25,260 Not Implemented
SU0180 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,507 $0 Implemented
SU0180 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $13,590 $0 Implemented
SU0180 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,884 $0 Implemented
SU0180 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $964 $0 Implemented
SU0180 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,647 $712 Not Implemented
SU0180 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $291 $680 Implemented