IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0237 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,173 $0 Implemented
SU0237 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,815 $0 Not Implemented
SU0237 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,095 $0 Not Implemented
SU0183 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,014 $0 Not Implemented
SU0183 # 01 Y:2004 01 2004 $83,900 $0 Implemented
SU0183 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $331 $0 Implemented
SU0183 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,663 $502 Not Implemented
SU0183 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $680 Implemented
SU0183 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $18,502 $12,517 Not Implemented
SU0183 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $483 $523 Implemented
SU0183 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,288 $16,817 Implemented
SU0183 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,121 $25,260 Not Implemented
SU0160 # 01 Y:2003 01 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $446,941 $142,000 Not Implemented
SU0160 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,997 $3,315 Not Implemented
SU0160 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $158,477 $3,600 Not Implemented
SU0160 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,336,834 $875,536 Implemented
SU0160 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $16,605 $34,047 Not Implemented
SU0160 # 05 Y:2003 05 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $8,492 $4,200 Not Implemented
SU0160 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,587 $0 Not Implemented
SU0160 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $6,473 $6,375 Not Implemented
SU0160 # 08 Y:2003 08 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,145 $12,781 Not Implemented