IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0170 # 01 Y:2003 01 2003 $1,400 $0 Not Implemented
SU0170 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,666 $16,761 Not Implemented
SU0170 # 08 Y:2003 08 2003 REPLACE BOILER $10,809 $33,514 Not Implemented
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented
SU0170 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $0 Not Implemented
SU0170 # 03 Y:2003 03 2003 $31,250 $1,000 Implemented
SU0169 # 05 Y:2003 05 2003 $10,608 $9,520 Not Implemented
SU0169 # 02 Y:2003 02 2003 $53,040 $348 Implemented
SU0169 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $168 Implemented
SU0169 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $26 Implemented
SU0169 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Implemented
SU0169 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,846 $7,106 Not Implemented
SU0168 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,037 $227 Implemented
SU0168 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,579 $9,450 Not Implemented
SU0168 # 07 Y:2003 07 2003 MOVE BOILER TO MORE EFFICIENT LOCATION $5,735 $18,000 Not Implemented
SU0168 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,295 $0 Implemented
SU0168 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $5,551 $0 Implemented
SU0168 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $0 Implemented
SU0168 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,662 $85 Not Implemented
SU0167 # 03 Y:2003 03 2003 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $8,152 $147 Not Implemented
SU0167 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $633 $0 Not Implemented
SU0167 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $839 $0 Implemented
SU0167 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $603 $116 Not Implemented