IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0752 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,566 $37,930 Implemented
MA0752 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,599 $47,900 Implemented
MA0752 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $16,956 $9,990 Not Implemented
MA0752 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,878 $100 Not Implemented
MA0752 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,894 $203 Not Implemented
MA0752 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $4,785 Not Implemented
MA0752 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,976 $186,150 Not Implemented
SU0397 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $552 Implemented
SU0397 # 08 Y:2015 08 2015 REDUCE VENTILATION AIR $158 $499 Not Implemented
SU0397 # 07 Y:2015 07 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $131 $357 Not Implemented
SU0397 # 06 Y:2015 06 2015 UPGRADE OBSOLETE EQUIPMENT $151 $330 Implemented
SU0397 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $584 $1,190 Not Implemented
SU0397 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $573 Not Implemented
SU0397 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,078 $16,120 Not Implemented
SU0397 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $1,220 Implemented
SU0395 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,804 $9,736 Not Implemented
SU0395 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $66 $132 Not Implemented
SU0395 # 04 Y:2015 04 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,740 $7,476 Implemented
SU0395 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,174 $1,020 Implemented
SU0395 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $86 Implemented
SU0395 # 01 Y:2015 01 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,070 $3,930 Not Implemented
SU0382 # 01 Y:2015 01 2015 USE SYNTHETIC LUBRICANT $362 $0 Not Implemented
SU0382 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,982 $1,901 Not Implemented
SU0382 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $320 Not Implemented
SU0382 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,679 $10,400 Not Implemented