IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0261 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $249 Implemented
SU0261 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $1,114 Implemented
SU0261 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $7,860 Implemented
SU0261 # 08 Y:2007 08 2007 REDUCE VENTILATION AIR $12,057 $13,919 Implemented
SU0261 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $630 Not Implemented
SU0261 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,800 $5,887 Implemented
SU0261 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $40 $153 Implemented
SU0261 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $368 $1,801 Implemented
SU0261 # 13 Y:2007 13 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,169 $135,500 Implemented
MA0610 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,053 $49,555 Not Implemented
MA0610 # 02 Y:2007 02 2007 $5,760 $7,600 Implemented
MA0610 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,399 $10,600 Implemented
MA0610 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,743 $4,700 Implemented
MA0610 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,320 $2,782 Not Implemented
MA0610 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $94 $100 Implemented
SU0196 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,000 $0 Implemented
SU0196 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,956 $0 Implemented
SU0196 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Not Implemented
SU0196 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $653 Implemented
SU0196 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $344 $888 Not Implemented
SU0136 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,000 $0 Not Implemented
SU0136 # 02 Y:2002 02 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,245 $0 Implemented
SU0136 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,526 $270 Not Implemented
SU0136 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,696 $60 Not Implemented
SU0136 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,332 $107 Not Implemented