Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0123 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,325 | $7,060 | Implemented |
SU0123 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,968 | $694 | Implemented |
SU0123 # 01 Y:2001 | 01 | 2001 | ELIMINATE SHIFT | $13,517 | $0 | Not Implemented |
SU0123 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $378 | $196 | Implemented |
SU0123 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $739 | $0 | Implemented |
SU0123 # 04 Y:2001 | 04 | 2001 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,800 | $0 | Implemented |
SU0123 # 08 Y:2001 | 08 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $42 | $3 | Implemented |
SU0123 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $347 | $117 | Implemented |
SU0120 # 07 Y:2001 | 07 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,567 | $20,000 | Not Implemented |
SU0120 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,600 | $0 | Not Implemented |
SU0120 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $188 | $30 | Not Implemented |
SU0120 # 01 Y:2001 | 01 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,106 | $0 | Implemented |
SU0120 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $160 | $840 | Not Implemented |
SU0120 # 06 Y:2001 | 06 | 2001 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $21,289 | $75,000 | Not Implemented |
SU0120 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,537 | $8,750 | Not Implemented |
SU0109 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,244 | $0 | Not Implemented |
SU0109 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $28 | $0 | Implemented |
SU0109 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $1,123 | $213 | Implemented |
SU0109 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $662 | Implemented |
SU0109 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,828 | $30 | Implemented |
SU0109 # 06 Y:2001 | 06 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $982 | $0 | Not Implemented |
SU0108 # 07 Y:2001 | 07 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,590 | $7,000 | Implemented |
SU0108 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,892 | $203 | Not Implemented |
SU0108 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $780 | $81 | Implemented |
SU0108 # 03 Y:2001 | 03 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,590 | $22,825 | Not Implemented |