Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1097 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,544 | $0 | n/a |
UD1097 # 03 Y:2025 | 03 | 2025 | MINIMIZE WATER USAGE | $1,616 | $0 | n/a |
UD1097 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $900 | n/a |
UD1097 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $0 | n/a |
UD1097 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $471 | $320 | n/a |
UD1097 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $63,287 | $0 | n/a |
UD1097 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,568 | $0 | n/a |
UD1097 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $14,406 | n/a |
UD1097 # 02 Y:2025 | 02 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,598 | $104 | n/a |
UD1096 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $6,096 | n/a |
UD1096 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,210 | $242,106 | n/a |
UD1096 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,551 | $5,809 | n/a |
UD1096 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $407 | $0 | n/a |
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
UD1096 # 03 Y:2024 | 03 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,522 | $1,061 | n/a |
UD1096 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $872 | n/a |
UD1095 # 02 Y:2024 | 02 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $581 | $10,500 | n/a |
UD1095 # 01 Y:2024 | 01 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $252 | $1,500 | n/a |
UD1095 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,050 | $0 | n/a |
UD1094 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $9,350 | $130,000 | n/a |
UD1094 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $880 | $0 | n/a |
UD1094 # 03 Y:2024 | 03 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $342 | $20,000 | n/a |
UD1093 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,360 | $48,200 | n/a |
UD1093 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,247 | $720 | n/a |
UD1093 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,379 | $1,330 | n/a |