Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,136
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1118 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,394 | $1,740 | n/a |
UD1118 # 02 Y:2025 | 02 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,958 | $0 | n/a |
UD1118 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,142 | $0 | n/a |
UD1118 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $2,030 | n/a |
UD1118 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $894 | $0 | n/a |
UD1118 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $186 | $153 | n/a |
UD1118 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $23,759 | $18,000 | n/a |
UD1122 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,853 | $25,000 | n/a |
UD1117 # 03 Y:2025 | 03 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,839 | $947 | n/a |
UD1122 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,949 | $900,000 | n/a |
UD1117 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $0 | n/a |
UD1117 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,029 | $4,975 | n/a |
UD1122 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $124 | $300 | n/a |
UD1117 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,656 | $1,015 | n/a |
UD1122 # 01 Y:2025 | 01 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $46,945 | $400,000 | n/a |
UD1117 # 05 Y:2025 | 05 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,113 | $0 | n/a |
UD1122 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $4,000 | n/a |
UD1117 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,183 | $15,550 | n/a |
UD1122 # 03 Y:2025 | 03 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,430 | $7,500 | n/a |
UD1121 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $270 | $7,500 | n/a |
UD1121 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $388 | $7,500 | n/a |
UD1121 # 02 Y:2025 | 02 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $6,748 | $500 | n/a |
UD1121 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,502 | $160,000 | n/a |
UD1121 # 01 Y:2025 | 01 | 2025 | REPLACE BOILER | $2,668 | $50,000 | n/a |
UD1121 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $70 | $300 | n/a |