IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0970 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $164 $50 Not Implemented
UD0970 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $298 $1,000 Implemented
UD0970 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $1,000 Not Implemented
UD0970 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $541 $250 Implemented
UD0970 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,698 $2,000 Not Implemented
UD0970 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,577 $49,400 Not Implemented
UD0970 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $142 $0 Implemented
UD0970 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $570 $0 Implemented
UD0966 # 02 Y:2017 02 2017 INSTALL TIMERS AND/OR THERMOSTATS $12,245 $25,000 Not Implemented
UD0966 # 01 Y:2017 01 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $217,648 $48,962 Not Implemented
UD0966 # 03 Y:2017 03 2017 IMPROVE COMBUSTION CONTROL CAPABILITY $270,579 $100,000 Not Implemented
UD0966 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,225 $4,000 Not Implemented
UD0966 # 09 Y:2017 09 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $76,595 $198,657 Not Implemented
UD0966 # 08 Y:2017 08 2017 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $229,882 $595,039 Not Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
UD0966 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,748 $4,000 Not Implemented
UD0966 # 05 Y:2017 05 2017 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $57,432 $35,000 Not Implemented
UM0482 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,148 $2,000 n/a
UM0482 # 04 Y:2017 04 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,040 $390 n/a
UM0482 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,675 $3,000 n/a
UM0482 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $26,386 $13,350 n/a
WV0537 # 01 Y:2017 01 2017 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $86,765 $200,500 Not Implemented
WV0537 # 02 Y:2017 02 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $18,040 $80,000 Not Implemented
WV0537 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,952 $7,891 Implemented
WV0537 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,934 $1,200 Implemented