IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 3271 Clay Product and Refractory Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0937 # 03 Y:2015 03 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,253 $0 Implemented
UD0937 # 02 Y:2015 02 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,573 $2,850 Not Implemented
UD0937 # 01 Y:2015 01 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,087 $0 Implemented
UD0909 # 02 Y:2014 02 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,680 $1,125 Implemented
UD0909 # 11 Y:2014 11 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $7,664 $8,319 Not Implemented
UD0909 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,327 $3,000 Not Implemented
UD0909 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $1,000 Implemented
UD0909 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,214 $5,000 Implemented
UD0909 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $2,940 Implemented
UD0909 # 04 Y:2014 04 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $759 $500 Not Implemented
UD0909 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $16,710 $4,000 Not Implemented
UD0909 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,106 $510 Not Implemented
UD0909 # 12 Y:2014 12 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,987 $17,000 Not Implemented
UD0825 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $100 Not Implemented
UD0825 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,976 $2,000 Not Implemented
UD0825 # 03 Y:2010 03 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,869 $10,000 Not Implemented
UD0825 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,525 $100 Not Implemented
UD0825 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $25 Not Implemented
UD0825 # 06 Y:2010 06 2010 AVOID REWINDING MOTORS MORE THAN TWICE $783 $971 Not Implemented
UD0825 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $268 $75 Not Implemented
UD0825 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $60 Not Implemented
UD0825 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,851 $13,500 Not Implemented
UD0825 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,151 $1,200 Not Implemented