Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0726 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $157,981 | $295,540 | Not Implemented |
UD0726 # 17 Y:2005 | 17 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $412 | $960 | Implemented |
UD0726 # 16 Y:2005 | 16 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $1,253 | $0 | Implemented |
UD0726 # 15 Y:2005 | 15 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,554 | $0 | Implemented |
UD0726 # 14 Y:2005 | 14 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,948 | $500 | Not Implemented |
UD0726 # 13 Y:2005 | 13 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,679 | $0 | Implemented |
UD0726 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,280 | $736 | Implemented |
UD0726 # 11 Y:2005 | 11 | 2005 | COVER OPEN TANKS | $4,429 | $1,200 | Implemented |
UD0726 # 10 Y:2005 | 10 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,819 | $12,560 | Implemented |
UD0726 # 08 Y:2005 | 08 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $19,593 | $40,000 | Not Implemented |
UD0726 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $19,788 | $4,000 | Implemented |
UD0726 # 06 Y:2005 | 06 | 2005 | REDUCE VENTILATION AIR | $26,800 | $0 | Implemented |
UD0726 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,707 | $93,840 | Implemented |
UD0726 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $93,662 | $72,100 | Implemented |
UD0726 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM THICKNESS INSULATION | $113,135 | $17,165 | Not Implemented |
UD0726 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $222,216 | $3,730 | Implemented |
UD0726 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,470 | $3,940 | Not Implemented |
WV0320 # 16 Y:2005 | 16 | 2005 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $351 | $26 | Not Implemented |
WV0320 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,732 | $1,645 | Implemented |
WV0320 # 07 Y:2005 | 07 | 2005 | USE COMPRESSOR AIR FILTERS | $2,183 | $800 | Not Implemented |
WV0320 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,232 | $0 | Not Implemented |
WV0320 # 05 Y:2005 | 05 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,094 | $2,700 | Implemented |
WV0320 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $4,359 | $4,750 | Implemented |
WV0320 # 03 Y:2005 | 03 | 2005 | BURN WASTE OIL FOR HEAT | $4,770 | $4,000 | Not Implemented |
WV0320 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,978 | $5,805 | Implemented |