IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0730 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,357 $3,600 Not Implemented
UD0730 # 13 Y:2005 13 2005 COVER OPEN TANKS $315 $0 Not Implemented
UD0730 # 12 Y:2005 12 2005 REDUCE VENTILATION AIR $1,408 $0 Not Implemented
UD0730 # 11 Y:2005 11 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $945 Implemented
UD0730 # 10 Y:2005 10 2005 USE MINIMUM SAFE OVEN VENTILATION $3,222 $150 Not Implemented
UD0730 # 09 Y:2005 09 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $3,480 $1,500 Not Implemented
UD0730 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,232 $9,916 Implemented
UD0730 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,376 $1,000 Implemented
UD0730 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $5,769 $4,350 Not Implemented
UD0730 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,473 $12,880 Implemented
UD0730 # 04 Y:2005 04 2005 COVER OPEN TANKS $12,069 $2,170 Not Implemented
UD0730 # 03 Y:2005 03 2005 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $13,381 $25,000 Not Implemented
UD0730 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,475 $7,200 Not Implemented
UD0730 # 14 Y:2005 14 2005 INSTALL OCCUPANCY SENSORS $192 $600 Not Implemented
WV0325 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $16,088 $12,504 Not Implemented
WV0325 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $260 Implemented
WV0325 # 11 Y:2005 11 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $775 $521 Not Implemented
WV0325 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $2,612 Implemented
WV0325 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $851 $426 Implemented
WV0325 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,637 $420 Implemented
WV0325 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $2,990 $257 Implemented
WV0325 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,529 $408 Not Implemented
WV0325 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,009 $0 Implemented
WV0325 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,050 $653 Implemented
WV0325 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,144 $662 Implemented