Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 25 | Furniture And Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0510 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $47,885 | $8,730 | Not Implemented |
WV0510 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,610 | $211,134 | Not Implemented |
WV0510 # 11 Y:2015 | 11 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,210 | $7,073 | Not Implemented |
WV0510 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,881 | $46 | Implemented |
WV0510 # 09 Y:2015 | 09 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,824 | $2,324 | Not Implemented |
WV0510 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,904 | $537 | Implemented |
WV0510 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,050 | $0 | Implemented |
WV0510 # 06 Y:2015 | 06 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $5,855 | $1,108 | Implemented |
WV0510 # 05 Y:2015 | 05 | 2015 | OPTIMIZE PLANT POWER FACTOR | $9,408 | $24,300 | Not Implemented |
WV0510 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $9,890 | $3,930 | Implemented |
WV0510 # 03 Y:2015 | 03 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $15,681 | $1,000 | Implemented |
UD0919 # 13 Y:2015 | 13 | 2015 | CLEAN FOULING FROM WATER LINES REGULARLY | $5,080 | $2,750 | Not Implemented |
UD0919 # 12 Y:2015 | 12 | 2015 | MAKE A NEW BY-PRODUCT | $24,789 | $46,000 | Not Implemented |
UD0919 # 11 Y:2015 | 11 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $242 | $700 | Not Implemented |
UD0919 # 10 Y:2015 | 10 | 2015 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,652 | $5,000 | Not Implemented |
UD0919 # 09 Y:2015 | 09 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,591 | $4,300 | Not Implemented |
UD0919 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,715 | $0 | Implemented |
UD0919 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,674 | $0 | Implemented |
UD0919 # 06 Y:2015 | 06 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,496 | $2,295 | Not Implemented |
UD0919 # 05 Y:2015 | 05 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $36,602 | $22,000 | Not Implemented |
UD0919 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,266 | $9,200 | Implemented |
UD0919 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,936 | $50 | Implemented |
UD0919 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,792 | $0 | Implemented |
UD0919 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,757 | $0 | Implemented |