IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0255 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,774 $100 Implemented
WV0255 # 03 Y:2003 03 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $965 $2,700 Not Implemented
WV0255 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,019 $200 Not Implemented
WV0255 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,236 $2,025 Implemented
WV0255 # 06 Y:2003 06 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,452 $2,000 Implemented
WV0255 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,449 $2,455 Not Implemented
WV0255 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,094 $1,000 Implemented
WV0255 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $0 Implemented
WV0255 # 10 Y:2003 10 2003 REDUCE EXCESS STEAM BLEEDING $4,622 $80,000 Not Implemented
WV0255 # 11 Y:2003 11 2003 MINIMIZE WATER USAGE $315,882 $25,000 Not Implemented
UD0550 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,950 $139,962 Not Implemented
UD0550 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,061 $1,031 Implemented
UD0550 # 03 Y:1998 03 1998 $26,700 $40,000 Implemented
UD0528 # 01 Y:1997 01 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,108 $0 Implemented
UD0528 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,857 $10,000 Implemented
UD0528 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,076 $5,818 Implemented
UD0528 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,886 $200 Implemented
UD0528 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,859 $11,000 Not Implemented
UD0401 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,367 $0 Not Implemented
UD0401 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,994 $300 Implemented
UD0401 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $3,714 $10,139 Implemented
UD0401 # 04 Y:1993 04 1993 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,173 $18,000 Not Implemented
UD0401 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $0 Not Implemented
UD0401 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,944 $10,376 Implemented
TS0008 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,657 $0 Implemented