IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0206 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $632 $1,000 Implemented
UD0206 # 03 Y:1986 03 1986 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,724 $17,000 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented
UD0192 # 02 Y:1986 02 1986 REDUCE VENTILATION AIR $4,173 $2,500 Implemented
UD0174 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,998 $0 Not Implemented
UD0174 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $323 $583 Implemented
UD0174 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $1,000 Implemented
UD0174 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $763 $448 Implemented
UD0174 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,290 $5,000 Not Implemented
UD0174 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $457 $121 Implemented
UD0151 # 01 Y:1985 01 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $162 $0 Not Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0151 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $795 $284 Not Implemented
UD0144 # 01 Y:1984 01 1984 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $104,097 $320,000 Implemented
UD0147 # 01 Y:1984 01 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $5,049 $2,250 Implemented
UD0147 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $521 $600 Implemented
UD0147 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $346 Implemented
UD0147 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,055 $700 Implemented
UD0147 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $588 $680 Implemented
UD0122 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $8,037 $2,800 Implemented
UD0122 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,523 $1,000 Implemented
UD0122 # 03 Y:1984 03 1984 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $530 $1,000 Not Implemented
UD0122 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $73 Implemented
UD0121 # 01 Y:1984 01 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,826 $28,200 Not Implemented
UD0121 # 02 Y:1984 02 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,578 $15,000 Not Implemented