Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0455 # 13 Y:2012 | 13 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $1,157 | $841 | Implemented |
WV0455 # 11 Y:2012 | 11 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,644 | $1,000 | Implemented |
WV0455 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,863 | $1,706 | Implemented |
WV0455 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $3,160 | $5,680 | Not Implemented |
WV0455 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,600 | $3,294 | Implemented |
WV0455 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,374 | $4,330 | Not Implemented |
WV0455 # 14 Y:2012 | 14 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,149 | $4,320 | Not Implemented |
WV0455 # 10 Y:2012 | 10 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,663 | $2,117 | Implemented |
WV0455 # 08 Y:2012 | 08 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,918 | $4,850 | Not Implemented |
WV0455 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $6,023 | $2,440 | Implemented |
WV0455 # 18 Y:2012 | 18 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $377 | $500 | Implemented |
WV0455 # 12 Y:2012 | 12 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,418 | $1,000 | Implemented |
WV0455 # 15 Y:2012 | 15 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $845 | $70 | Implemented |
WV0455 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,439 | $5,745 | Implemented |
WV0455 # 01 Y:2012 | 01 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,670 | $16,140 | Not Implemented |
WV0455 # 16 Y:2012 | 16 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $712 | $620 | Implemented |
WV0455 # 17 Y:2012 | 17 | 2012 | USE PHOTOCELL CONTROLS | $645 | $620 | Implemented |
WV0455 # 02 Y:2012 | 02 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $6,540 | $12,520 | Not Implemented |
UD0863 # 14 Y:2012 | 14 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,215 | $14,000 | Not Implemented |
UD0863 # 13 Y:2012 | 13 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $43,532 | $0 | Implemented |
UD0863 # 12 Y:2012 | 12 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,619 | $12,800 | Not Implemented |
UD0863 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $10,008 | $2,600 | Implemented |
UD0863 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,548 | $2,000 | Not Implemented |
UD0863 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,285 | $9,900 | Not Implemented |
UD0863 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,871 | $8,000 | Not Implemented |