IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

612

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0237 # 05 Y:1987 05 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,129 $0 Implemented
UD0237 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,305 $67 Implemented
UD0237 # 07 Y:1987 07 1987 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,948 $4,140 Implemented
UD0237 # 08 Y:1987 08 1987 MINIMIZE WATER USAGE $3,986 $2,000 Implemented
UD0237 # 09 Y:1987 09 1987 RECOVER AND REUSE COOLING WATER $2,400 $4,000 Implemented
UD0231 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $1,070 Implemented
UD0231 # 03 Y:1987 03 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,586 $0 Implemented
UD0217 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,538 $5,000 Implemented
UD0217 # 02 Y:1987 02 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,993 $20,000 Implemented
UD0217 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $5,444 $1,000 Implemented
UD0205 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,692 $708 Implemented
UD0205 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,886 $5,000 Implemented
UD0205 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,480 $52,200 Implemented
UD0205 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $12,000 Implemented
UD0205 # 06 Y:1986 06 1986 RECOVER WASTE HEAT FROM EQUIPMENT $5,622 $11,000 Implemented
UD0206 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,458 $1,000 Implemented
UD0206 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $632 $1,000 Implemented
UD0206 # 03 Y:1986 03 1986 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,724 $17,000 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented
UD0192 # 02 Y:1986 02 1986 REDUCE VENTILATION AIR $4,173 $2,500 Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0144 # 01 Y:1984 01 1984 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $104,097 $320,000 Implemented
UD0147 # 01 Y:1984 01 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $5,049 $2,250 Implemented
UD0147 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $521 $600 Implemented
UD0147 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $346 Implemented