IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0205 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,692 $708 Implemented
UD0205 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,886 $5,000 Implemented
UD0205 # 03 Y:1986 03 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,480 $52,200 Implemented
UD0205 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $12,000 Implemented
UD0205 # 06 Y:1986 06 1986 RECOVER WASTE HEAT FROM EQUIPMENT $5,622 $11,000 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented
UD0192 # 02 Y:1986 02 1986 REDUCE VENTILATION AIR $4,173 $2,500 Implemented
UD0151 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,349 $315 Implemented
UD0147 # 01 Y:1984 01 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $5,049 $2,250 Implemented
UD0147 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $521 $600 Implemented
UD0147 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $346 Implemented
UD0147 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,055 $700 Implemented
UD0147 # 05 Y:1984 05 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $588 $680 Implemented
UD0122 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $8,037 $2,800 Implemented
UD0122 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,523 $1,000 Implemented
UD0122 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $73 Implemented
UD0094 # 02 Y:1983 02 1983 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,138 $11,160 Implemented
UD0055 # 01 Y:1982 01 1982 INSULATE BARE EQUIPMENT $2,363 $1,260 Implemented
UD0043 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $700 Implemented
UD0036 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $5,535 Implemented