Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0678 # 09 Y:2003 | 09 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $2,654 | $1,000 | Implemented |
UD0678 # 07 Y:2003 | 07 | 2003 | USE OPTIMUM TEMPERATURE | $5,406 | $500 | Not Implemented |
UD0678 # 06 Y:2003 | 06 | 2003 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $6,015 | $3,150 | Not Implemented |
UD0678 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,840 | $0 | Implemented |
UD0678 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,900 | $725 | Implemented |
UD0678 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $980 | Implemented |
UD0678 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,800 | $78,325 | Not Implemented |
UD0678 # 01 Y:2003 | 01 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $57,760 | $0 | Implemented |
UD0678 # 08 Y:2003 | 08 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,745 | $2,400 | Implemented |
UD0678 # 10 Y:2003 | 10 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,251 | $2,000 | Implemented |
UD0678 # 11 Y:2003 | 11 | 2003 | DISCONNECT BALLASTS | $1,865 | $90 | Implemented |
WV0266 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,398 | $735 | Not Implemented |
WV0266 # 01 Y:2003 | 01 | 2003 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $14,242 | $10,500 | Not Implemented |
WV0266 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $22,125 | $1,423 | Implemented |
WV0266 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,846 | $250 | Implemented |
WV0266 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,430 | $625 | Implemented |
WV0266 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,520 | $150 | Implemented |
WV0266 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,057 | $0 | Not Implemented |
WV0266 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,479 | $6,285 | Not Implemented |
WV0266 # 11 Y:2003 | 11 | 2003 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $142,002 | $980,000 | Not Implemented |
WV0266 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,937 | $79 | Implemented |
WV0266 # 13 Y:2003 | 13 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $994 | $1,240 | Not Implemented |
WV0266 # 15 Y:2003 | 15 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,178 | $80 | Not Implemented |
WV0266 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,326 | $0 | Implemented |
WV0266 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,000 | $2,550 | Implemented |