IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

770

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented
UD0168 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
UD0165 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,135 $2,000 Implemented
UD0165 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,934 $4,600 Implemented
UD0165 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,435 $0 Implemented
UD0165 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,848 $1,500 Implemented
UD0158 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,260 Implemented
UD0158 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $434 $280 Implemented
UD0158 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $240 Implemented
UD0153 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $2,450 Implemented
UD0153 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,666 $16,000 Implemented
UD0149 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,221 $2,000 Implemented
UD0149 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,360 $0 Implemented
UD0149 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $276 Implemented
UD0149 # 04 Y:1985 04 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $332 $300 Implemented
UD0138 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,759 $336 Implemented
UD0138 # 02 Y:1984 02 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,379 $15,000 Implemented
UD0131 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,171 $0 Implemented
UD0131 # 02 Y:1984 02 1984 REDUCE GLAZED AREAS IN BUILDINGS $17,464 $50,000 Implemented
UD0131 # 03 Y:1984 03 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,070 $8,000 Implemented
UD0131 # 04 Y:1984 04 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,853 $800 Implemented
UD0131 # 05 Y:1984 05 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,576 $4,000 Implemented
UD0131 # 06 Y:1984 06 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,453 $20,000 Implemented