IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0182 # 07 Y:1985 07 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,516 $2,500 Implemented
UD0182 # 06 Y:1985 06 1985 MINIMIZE WATER USAGE $38,577 $4,000 Implemented
UD0182 # 05 Y:1985 05 1985 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $2,860 $1,300 Not Implemented
UD0182 # 01 Y:1985 01 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $153,020 $24,416 Implemented
UD0182 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,436 $0 Implemented
UD0182 # 03 Y:1985 03 1985 COVER OPEN TANKS $8,435 $1,100 Implemented
UD0182 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,277 $50,700 Not Implemented
UD0175 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $25,286 $48,000 Implemented
UD0178 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $114 $150 Implemented
UD0178 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $225 Not Implemented
UD0178 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,380 $100 Not Implemented
UD0178 # 03 Y:1985 03 1985 LOWER CEILING TO REDUCE CONDITIONED SPACE $414 $1,250 Not Implemented
UD0178 # 02 Y:1985 02 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,261 $3,000 Not Implemented
UD0178 # 01 Y:1985 01 1985 COVER OPEN TANKS $2,265 $740 Not Implemented
UD0172 # 01 Y:1985 01 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,203 $150 Implemented
UD0172 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,225 $50 Implemented
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
UD0168 # 04 Y:1985 04 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $536 $0 Not Implemented
UD0168 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented
UD0168 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $300 Not Implemented
UD0168 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,217 $896 Not Implemented
UD0165 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,848 $1,500 Implemented
UD0165 # 01 Y:1985 01 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $33,571 $100,000 Not Implemented