Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0182 # 07 Y:1985 | 07 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,516 | $2,500 | Implemented |
UD0182 # 06 Y:1985 | 06 | 1985 | MINIMIZE WATER USAGE | $38,577 | $4,000 | Implemented |
UD0182 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $8,435 | $1,100 | Implemented |
UD0182 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,436 | $0 | Implemented |
UD0182 # 01 Y:1985 | 01 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $153,020 | $24,416 | Implemented |
UD0178 # 06 Y:1985 | 06 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $114 | $150 | Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0172 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $123 | Implemented |
UD0172 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,225 | $50 | Implemented |
UD0172 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,203 | $150 | Implemented |
UD0168 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $2,610 | $1,000 | Implemented |
UD0168 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
UD0165 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,848 | $1,500 | Implemented |
UD0165 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,435 | $0 | Implemented |
UD0165 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,934 | $4,600 | Implemented |
UD0165 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,000 | Implemented |
UD0158 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $240 | Implemented |
UD0158 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $434 | $280 | Implemented |
UD0158 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,260 | Implemented |
UD0153 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,666 | $16,000 | Implemented |
UD0153 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,255 | $2,450 | Implemented |
UD0149 # 01 Y:1985 | 01 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,221 | $2,000 | Implemented |
UD0149 # 04 Y:1985 | 04 | 1985 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $332 | $300 | Implemented |
UD0149 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $765 | $276 | Implemented |