IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0806 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $75,878 $0 Implemented
UD0806 # 18 Y:2009 18 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $624 $1,000 Implemented
UD0806 # 17 Y:2009 17 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,995 $0 Implemented
UD0806 # 16 Y:2009 16 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,636 $4,000 Not Implemented
UD0806 # 15 Y:2009 15 2009 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,991 $15,000 Not Implemented
UD0806 # 14 Y:2009 14 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,400 $6,174 Implemented
UD0806 # 13 Y:2009 13 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,419 $748 Not Implemented
UD0806 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,652 $990 Implemented
UD0806 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,165 $11,747 Not Implemented
UD0806 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,111 $12,665 Implemented
UD0806 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $169,364 $0 Implemented
UD0806 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,287 $157,500 Not Implemented
UD0806 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,959 $10,000 Not Implemented
UD0806 # 05 Y:2009 05 2009 COVER OPEN TANKS $11,513 $5,220 Not Implemented
UD0806 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $10,900 $5,010 Not Implemented
UD0806 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,909 $17,420 Implemented
UD0806 # 08 Y:2009 08 2009 OPTIMIZE PLANT POWER FACTOR $8,238 $64,000 Not Implemented
UD0806 # 10 Y:2009 10 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,025 $3,000 Not Implemented
UD0802 # 01 Y:2009 01 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,072 $16,185 Not Implemented
UD0802 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,384 $29,087 Implemented
UD0802 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,645 $0 Implemented
UD0802 # 04 Y:2009 04 2009 INSTALL AUTOMATIC STACK DAMPER $3,637 $1,000 Not Implemented
UD0802 # 05 Y:2009 05 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,711 $6,468 Not Implemented
UD0802 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,230 $1,500 Implemented
UD0802 # 07 Y:2009 07 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,084 $2,812 Not Implemented