IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0478 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,197 $4,790 Implemented
UD0478 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,021 $0 Implemented
UD0478 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,144 $0 Not Implemented
UD0477 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,444 $4,300 Implemented
UD0477 # 07 Y:1995 07 1995 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,625 $600 Not Implemented
UD0477 # 08 Y:1995 08 1995 RECOVER AND REUSE COOLING WATER $10,234 $2,500 Not Implemented
UD0477 # 09 Y:1995 09 1995 RECOVER AND REUSE COOLING WATER $16,375 $7,500 Implemented
UD0477 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,867 $5,759 Implemented
UD0477 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,196 $21,000 Implemented
UD0477 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $6,045 $4,000 Implemented
UD0477 # 06 Y:1995 06 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,150 $250 Implemented
UD0477 # 01 Y:1995 01 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,927 $0 Implemented
UD0476 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,234 $15,045 Implemented
UD0476 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $2,576 $1,920 Implemented
UD0476 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,376 $7,760 Implemented
UD0476 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,633 $10,570 Implemented
UD0476 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $1,000 Implemented
UD0476 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,648 $12,000 Implemented
UD0476 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,903 $3,290 Implemented
UD0476 # 07 Y:1995 07 1995 DISCONNECT BALLASTS $673 $210 Implemented
UD0475 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $10,410 Not Implemented
UD0475 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,260 $16,682 Not Implemented
UD0475 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $8,114 $8,000 Not Implemented
UD0475 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,945 $0 Not Implemented
UD0475 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,500 $5,000 Not Implemented