IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0584 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $356 Implemented
UD0584 # 01 Y:1999 01 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $28,107 $3,150 Implemented
UD0584 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $998 $1,200 Implemented
UD0583 # 01 Y:1999 01 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $6,264 $0 Implemented
UD0583 # 02 Y:1999 02 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,367 $4,000 Not Implemented
UD0583 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $2,731 $7,004 Not Implemented
UD0582 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $19,416 $3,300 Implemented
UD0582 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,601 $16,538 Implemented
UD0581 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $918 $200 Not Implemented
UD0581 # 01 Y:1999 01 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $370,588 $40,000 Implemented
UD0582 # 02 Y:1999 02 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $38,800 $0 Implemented
UD0582 # 05 Y:1999 05 1999 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $5,808 $3,600 Not Implemented
UD0581 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $27,501 $6,000 Not Implemented
UD0582 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,380 $4,000 Not Implemented
UD0581 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,000 $0 Not Implemented
UD0582 # 01 Y:1999 01 1999 AUTOMATE FINISHING PROCESS $96,632 $200,000 Not Implemented
UM0150 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,067 $880 Not Implemented
UM0150 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,828 $1,500 Not Implemented
UM0150 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,923 $1,750 Not Implemented
UM0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $300 Implemented
UM0150 # 05 Y:1999 05 1999 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $35,216 $50,000 Not Implemented
UM0149 # 07 Y:1999 07 1999 EXPAND OPERATIONS INTO UNUSED SPACE $357,000 $714,000 Not Implemented
UM0149 # 05 Y:1999 05 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,804 $0 Not Implemented
UM0149 # 06 Y:1999 06 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,500 $40,000 Implemented
UM0149 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $200 Implemented