Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1118 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $23,759 | $18,000 | n/a |
UD1118 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $723 | $2,030 | n/a |
UD1118 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $894 | $0 | n/a |
UD1118 # 02 Y:2025 | 02 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,958 | $0 | n/a |
UD1118 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,142 | $0 | n/a |
UD1118 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,394 | $1,740 | n/a |
UD1118 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $186 | $153 | n/a |
UD1122 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $124 | $300 | n/a |
UD1117 # 03 Y:2025 | 03 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,839 | $947 | n/a |
UD1117 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,029 | $4,975 | n/a |
UD1117 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $0 | n/a |
UD1117 # 05 Y:2025 | 05 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,113 | $0 | n/a |
UD1122 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,949 | $900,000 | n/a |
UD1122 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,853 | $25,000 | n/a |
UD1117 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,656 | $1,015 | n/a |
UD1117 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,183 | $15,550 | n/a |
UD1122 # 01 Y:2025 | 01 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $46,945 | $400,000 | n/a |
UD1122 # 03 Y:2025 | 03 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,430 | $7,500 | n/a |
UD1122 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $4,000 | n/a |
UD1121 # 06 Y:2025 | 06 | 2025 | KEEP EQUIPMENT CLEAN | $816 | $500 | n/a |
UD1121 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $270 | $7,500 | n/a |
UD1121 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $70 | $300 | n/a |
UD1121 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,502 | $160,000 | n/a |
UD1121 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $388 | $7,500 | n/a |
UD1121 # 01 Y:2025 | 01 | 2025 | REPLACE BOILER | $2,668 | $50,000 | n/a |