IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

468

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0691 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,415 $18,250 Not Implemented
UD0691 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,885 $630 Implemented
UD0691 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $5,450 $8,600 Not Implemented
UD0691 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,290 $16,271 Not Implemented
UD0691 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $4,541 $68 Implemented
UD0691 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,530 $630 Implemented
UD0691 # 08 Y:2004 08 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,020 $0 Not Implemented
UD0691 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $890 $220 Implemented
UD0691 # 10 Y:2004 10 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $790 $0 Implemented
UD0691 # 11 Y:2004 11 2004 REDUCE FLUID FLOW RATES $177 $0 Not Implemented
UM0248 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $18,156 $2,400 Not Implemented
UM0248 # 02 Y:2004 02 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,467 $2,000 Implemented
UM0248 # 03 Y:2004 03 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,420 $920 Not Implemented
UM0248 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $225 Implemented
UM0248 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,550 $1,000 Not Implemented
UD0690 # 01 Y:2004 01 2004 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $24,929 $9,930 Not Implemented
UD0690 # 02 Y:2004 02 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,916 $9,244 Not Implemented
UD0690 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,576 $7,366 Implemented
UD0690 # 04 Y:2004 04 2004 REDUCE FLUID FLOW RATES $4,171 $2,400 Implemented
UD0690 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,955 $5,625 Not Implemented
UD0690 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,580 $0 Implemented
UD0690 # 07 Y:2004 07 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,533 $2,240 Not Implemented
UD0690 # 08 Y:2004 08 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,197 $86 Not Implemented
UD0690 # 09 Y:2004 09 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,085 $6 Not Implemented
UD0690 # 10 Y:2004 10 2004 STANDARDIZE MOTOR INVENTORY $952 $340 Not Implemented