IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

309

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0823 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,268 $25 Implemented
UD0823 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $500 Not Implemented
UD0823 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $25 Implemented
UD0823 # 11 Y:2010 11 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,629 $7,500 Not Implemented
UD0823 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $3,244 $63 Not Implemented
UD0823 # 13 Y:2010 13 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,010 $50,050 Implemented
UD0823 # 14 Y:2010 14 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,832 $9,160 Not Implemented
UD0823 # 15 Y:2010 15 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $355 $25 Implemented
UD0822 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $609 $609 Not Implemented
UD0822 # 02 Y:2010 02 2010 INSTALL WIND POWERED ELECTRIC GENERATOR $244,092 $1,216,000 Not Implemented
UD0822 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,399 $8,760 Not Implemented
UD0822 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,724 $24,375 Not Implemented
UD0822 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $677 $125 Not Implemented
UD0822 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,400 $2,000 Not Implemented
UD0822 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,219 $5,273 Not Implemented
UD0822 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,449 $500 Not Implemented
UD0822 # 09 Y:2010 09 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,033 $39,100 Not Implemented
UD0822 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,483 $63 Implemented
UD0822 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,147 $2,100 Not Implemented
UD0822 # 12 Y:2010 12 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $1,500 $14,900 Not Implemented
UM0372 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $2,083 $2,500 Implemented
UM0372 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $25,000 Implemented
UM0372 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $265 $2,000 Implemented
UM0372 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $645 $200 Implemented
UM0372 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $88 $1,000 Implemented