IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0804 # 02 Y:2011 02 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,961 $238,050 Not Implemented
OK0804 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $2,073 $8,279 Not Implemented
OK0804 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,107 $19,271 Not Implemented
OK0804 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $1,843 Not Implemented
OK0804 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,295 $2,286 Not Implemented
OK0804 # 10 Y:2011 10 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,632 $4,325 Not Implemented
OK0804 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,362 $750 Implemented
OK0804 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,223 $18,797 Not Implemented
OK0804 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,996 $28,404 Not Implemented
OK0804 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,796 $56,474 Implemented
OK0804 # 04 Y:2011 04 2011 INSTALL SET-BACK TIMERS $740 $1,625 Not Implemented
OK0804 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $12,835 $19,625 Not Implemented
OK0804 # 01 Y:2011 01 2011 Install Anaerobic Digester $544,130 $5,652,880 Not Implemented
OK0804 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,244 $4,120 Not Implemented
OK0778 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,933 $525 Implemented
OK0778 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $412 $0 Implemented
OK0778 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,111 $5,417 Implemented
OK0778 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,464 $1,266 Implemented
OK0778 # 01 Y:2009 01 2009 $171,482 $47,731 Implemented
OK0706 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,579 $1,500 Implemented
OK0706 # 02 Y:2005 02 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,672 $13,451 Implemented
OK0706 # 03 Y:2005 03 2005 INSTALL SET-BACK TIMERS $4,084 $1,468 Not Implemented
OK0706 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,296 $2,239 Not Implemented
OK0706 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,610 $10,437 Not Implemented
OK0706 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,308 $802 Not Implemented