IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
NAICS 33341 Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0878 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $5,148 Implemented
OK0817 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,812 $1,220 Not Implemented
OK0817 # 09 Y:2011 09 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,450 $4,260 Not Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0817 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,745 Not Implemented
OK0817 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,751 Not Implemented
OK0817 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,469 $55,540 Not Implemented
OK0817 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,965 $47,375 Not Implemented
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
OK0817 # 08 Y:2011 08 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,546 $12,837 Not Implemented
OK0800 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $860 $1,865 Implemented
OK0800 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $334 Implemented
OK0800 # 01 Y:2010 01 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,533 $32,670 Not Implemented
OK0800 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $706 Implemented
OK0800 # 02 Y:2010 02 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,667 $2,700 Implemented
OK0800 # 07 Y:2010 07 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,127 $0 Not Implemented
OK0800 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $1,678 Implemented
OK0796 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $5,526 Implemented
OK0796 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $14,578 Implemented
OK0796 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $16,798 $29,735 Not Implemented
OK0796 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $1,378 Not Implemented
OK0796 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,383 $500 Implemented
OK0796 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $851 $217 Not Implemented
OK0796 # 07 Y:2010 07 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,028 $23,000 Not Implemented