IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0994 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,051 $590 Implemented
OK0880 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,087 $3,573 Not Implemented
OK0880 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $78 $376 Not Implemented
OK0880 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,385 $3,468 Not Implemented
OK0880 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $6,439 $6,993 Not Implemented
OK0880 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $227 $798 Not Implemented
OK0880 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $10,569 $37,500 Not Implemented
OK0880 # 04 Y:2014 04 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,695 $8,800 Not Implemented
OK0880 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,983 $61,440 Implemented
OK0880 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $463 Not Implemented
OK0880 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $706 $689 Not Implemented
OK0790 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $22,023 $495,980 Not Implemented
OK0790 # 02 Y:2010 02 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,353 $30,200 Not Implemented
OK0790 # 03 Y:2010 03 2010 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $32,076 $0 Implemented
OK0790 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,083 $4,638 Not Implemented
OK0790 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,871 $1,750 Implemented
OK0790 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $0 Not Implemented
OK0790 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $3,031 $11,550 Not Implemented
OK0790 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $20,203 Implemented
OK0790 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $9,806 Not Implemented
OK0790 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $13 Implemented
OK0790 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $334 $418 Implemented
OK0741 # 05 Y:2007 05 2007 INSTALL SET-BACK TIMERS $273 $248 Not Implemented
OK0741 # 04 Y:2007 04 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,042 $6,800 Not Implemented
OK0741 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,666 $860 Not Implemented