IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0882 # 03 Y:2014 03 2014 INSTALL TIMERS AND/OR THERMOSTATS $8,378 $2,870 Not Implemented
OK0882 # 02 Y:2014 02 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $37,574 $29,200 Not Implemented
OK0882 # 01 Y:2014 01 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,763 $1,400 Implemented
OK0764 # 08 Y:2008 08 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $2,877 $0 Not Implemented
OK0764 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,109 $5,086 Not Implemented
OK0764 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,596 $14,878 Not Implemented
OK0764 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $1,165 Not Implemented
OK0764 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $22,038 $14,300 Not Implemented
OK0764 # 06 Y:2008 06 2008 CLOSE OFF UNNEEDED STEAM LINES $7,161 $0 Not Implemented
OK0764 # 07 Y:2008 07 2008 REPAIR OR REPLACE STEAM TRAPS $28,620 $23,375 Not Implemented
OK0764 # 05 Y:2008 05 2008 $7,000 $0 Not Implemented
OK0724 # 05 Y:2006 05 2006 $13,458 $0 Not Implemented
OK0724 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $588 $322 Not Implemented
OK0724 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,492 $1,975 Not Implemented
OK0724 # 03 Y:2006 03 2006 OPERATE BOILERS ON HIGH FIRE SETTING $41,858 $4,100 Not Implemented
OK0724 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $380 $288 Not Implemented
OK0724 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,235 $5,958 Not Implemented
OK0724 # 07 Y:2006 07 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,655 $2,592 Not Implemented
OK0724 # 11 Y:2006 11 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,211 $5,963 Not Implemented
OK0724 # 10 Y:2006 10 2006 USE COMPRESSOR AIR FILTERS $2,647 $642 Not Implemented
OK0724 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $169 $495 Not Implemented
OK0724 # 09 Y:2006 09 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $28,864 $61,416 Not Implemented
OK0712 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $672 $1,820 Not Implemented
OK0712 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,800 $5,000 Not Implemented
OK0712 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $39,487 $48,800 Not Implemented