IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0750 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $7,391 Not Implemented
OK0750 # 03 Y:2007 03 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,091 $4,248 Not Implemented
OK0750 # 02 Y:2007 02 2007 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,776 $8,988 Not Implemented
OK0750 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $5,428 $33,634 Not Implemented
OK0750 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,081 $5,998 Not Implemented
OK0750 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,525 $1,000 Not Implemented
OK0750 # 01 Y:2007 01 2007 INSTALL TIMERS AND/OR THERMOSTATS $6,319 $1,100 Not Implemented
OK0750 # 04 Y:2007 04 2007 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $8,272 $16,000 Not Implemented
OK0750 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,287 $6,522 Not Implemented
OK0750 # 10 Y:2007 10 2007 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,150,588 $195,000 Not Implemented
OK0749 # 03 Y:2007 03 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $126,819 $38,280 Not Implemented
OK0749 # 02 Y:2007 02 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $66,275 $21,000 Not Implemented
OK0749 # 01 Y:2007 01 2007 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $74,106 $206,725 Not Implemented
OK0749 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,461 $0 Implemented
OK0749 # 07 Y:2007 07 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $181,080 $110,352 Not Implemented
OK0749 # 08 Y:2007 08 2007 OPERATE BOILERS ON HIGH FIRE SETTING $238,762 $50,000 Not Implemented
OK0749 # 04 Y:2007 04 2007 REPAIR AND ELIMINATE STEAM LEAKS $93,609 $4,680 Not Implemented
OK0749 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,286 $1,985 Not Implemented
OK0747 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,756 $0 Not Implemented
OK0747 # 07 Y:2007 07 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,068 $200 Not Implemented
OK0747 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $22,903 $139,000 Not Implemented
OK0747 # 05 Y:2007 05 2007 USE SOLAR HEAT FOR HEAT $14,978 $138,320 Not Implemented
OK0747 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,099 $0 Not Implemented
OK0747 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $991 $326 Not Implemented
OK0747 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,165 $4,559 Implemented