Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0818 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $482 $2,104 Implemented
OK0818 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,726 $1,635 Implemented
OK0818 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $386 Not Implemented
OK0818 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,355 $4,015 Not Implemented
OK0818 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,735 $29,626 Not Implemented
OK0818 # 09 Y:2011 09 2011 INSTALL WIND POWERED ELECTRIC GENERATOR $17,200 $168,000 Not Implemented
OK0818 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $309 $2,707 Not Implemented
OK0818 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,786 $40,503 Not Implemented
OK0818 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $8,413 $91,000 Implemented
OK0817 # 08 Y:2011 08 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,546 $12,837 Not Implemented
OK0817 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,965 $47,375 Not Implemented
OK0817 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,745 Not Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
OK0817 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,469 $55,540 Not Implemented
OK0817 # 09 Y:2011 09 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,450 $4,260 Not Implemented
OK0817 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,751 Not Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0817 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,812 $1,220 Not Implemented
OK0816 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $1,893 $2,263 Not Implemented
OK0816 # 06 Y:2011 06 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,197 $9,150 Not Implemented
OK0816 # 01 Y:2011 01 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,409 $71,773 Not Implemented
OK0816 # 07 Y:2011 07 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,005 $315,900 Not Implemented
OK0816 # 09 Y:2011 09 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,244 $11,700 Not Implemented
OK0816 # 08 Y:2011 08 2011 REPLACE BOILER $26,135 $24,220 Implemented