Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0818 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $482 | $2,104 | Implemented |
OK0818 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,726 | $1,635 | Implemented |
OK0818 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $535 | $386 | Not Implemented |
OK0818 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,355 | $4,015 | Not Implemented |
OK0818 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,735 | $29,626 | Not Implemented |
OK0818 # 09 Y:2011 | 09 | 2011 | INSTALL WIND POWERED ELECTRIC GENERATOR | $17,200 | $168,000 | Not Implemented |
OK0818 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $309 | $2,707 | Not Implemented |
OK0818 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,786 | $40,503 | Not Implemented |
OK0818 # 01 Y:2011 | 01 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $8,413 | $91,000 | Implemented |
OK0817 # 08 Y:2011 | 08 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,546 | $12,837 | Not Implemented |
OK0817 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,965 | $47,375 | Not Implemented |
OK0817 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $2,745 | Not Implemented |
OK0817 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,011 | $23,400 | Implemented |
OK0817 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,371 | $0 | Implemented |
OK0817 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,469 | $55,540 | Not Implemented |
OK0817 # 09 Y:2011 | 09 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,450 | $4,260 | Not Implemented |
OK0817 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $2,751 | Not Implemented |
OK0817 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,438 | $510 | Implemented |
OK0817 # 02 Y:2011 | 02 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,812 | $1,220 | Not Implemented |
OK0816 # 12 Y:2011 | 12 | 2011 | INSULATE BARE EQUIPMENT | $1,893 | $2,263 | Not Implemented |
OK0816 # 06 Y:2011 | 06 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $13,197 | $9,150 | Not Implemented |
OK0816 # 01 Y:2011 | 01 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $20,409 | $71,773 | Not Implemented |
OK0816 # 07 Y:2011 | 07 | 2011 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,005 | $315,900 | Not Implemented |
OK0816 # 09 Y:2011 | 09 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,244 | $11,700 | Not Implemented |
OK0816 # 08 Y:2011 | 08 | 2011 | REPLACE BOILER | $26,135 | $24,220 | Implemented |