IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 321 Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0590 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,188 $87,787 Not Implemented
OR0590 # 02 Y:2012 02 2012 USE OPTIMUM TEMPERATURE $3,137 $0 Implemented
OR0590 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,954 $5,038 Not Implemented
OR0589 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,028 $43,292 Not Implemented
OR0589 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $53,151 Implemented
OR0589 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,711 $6,200 Implemented
OR0589 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,386 $0 Not Implemented
OR0582 # 04 Y:2012 04 2012 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,435 $34,000 Not Implemented
OR0582 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,291 $23,135 Not Implemented
OR0582 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $25,857 $33,400 Not Implemented
OR0582 # 01 Y:2012 01 2012 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $720 $500 Not Implemented
OR0581 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $27,601 $81,000 Not Implemented
OR0581 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,488 $6,761 Not Implemented
OR0581 # 04 Y:2012 04 2012 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,155 $7,334 Not Implemented
OR0581 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,590 $16,590 Not Implemented
OR0581 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $30,460 $37,511 Not Implemented
OR0581 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,161 $1,000 Not Implemented
OR0577 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,558 $7,571 Implemented
OR0577 # 06 Y:2012 06 2012 KEEP SOLID FUELS / RAW MATERIALS DRY $12,037 $50,000 Implemented
OR0577 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,184 $4,750 Not Implemented
OR0577 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,839 $17,100 Implemented
OR0577 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,720 $8,890 Not Implemented
OR0577 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,191 $1,404 Implemented