IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0468 # 05 Y:2004 05 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $72,800 $13,600 Not Implemented
OR0468 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $3,200 $3,100 Not Implemented
OR0468 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,200 $27,800 Implemented
OR0468 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $13,800 Implemented
OR0468 # 09 Y:2004 09 2004 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,800 $15,700 Implemented
OR0468 # 10 Y:2004 10 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $15,800 $26,600 Implemented
OR0468 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,650 $24,900 Not Implemented
OR0468 # 12 Y:2004 12 2004 $102,400 $242,000 Not Implemented
OR0426 # 01 Y:2003 01 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $104,400 $150 Implemented
OR0426 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,010 $135 Implemented
OR0426 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,720 $1,000 Implemented
OR0426 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,000 $41,000 Implemented
OR0426 # 05 Y:2003 05 2003 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $9,530 $73,800 Not Implemented
OR0426 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $6,080 Not Implemented
OR0426 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $0 Implemented
OR0325 # 01 Y:1998 01 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $5,486 $500 Not Implemented
OR0325 # 02 Y:1998 02 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,215 $6,816 Not Implemented
OR0325 # 03 Y:1998 03 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $4,674 $0 Implemented
OR0325 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,213 $1,000 Not Implemented
OR0325 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $970 $0 Not Implemented
OR0178 # 01 Y:1993 01 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,194 $640 Implemented
OR0178 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $1,500 Implemented
OR0178 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,364 $9,300 Not Implemented
OR0178 # 04 Y:1993 04 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $604 $0 Implemented
OR0178 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,419 $1,107 Implemented